GrAT provides its expertise through projects. Lifespan of a project varies from 6 months to 5 years. The clients also vary from a private company to a multinational institution. Three components – themes, modalities, and deliverables – define a project. Often more than theme is dealt with through in a combined set of methods to generate diverse results and outcomes. 

Broken image

Methodology for Product Service System Innovation – MEPPS

Methodology for Product Service System Innovation – MEPPS 2003-05; -; 
READ MORE
Broken image

Dehydratisierung von hochwertigen Lebensmitteln

The project was based on two pre-studies: 1. Market potential of dried fruits in Austria (2000), 2. Technology research “optimisation of dehydration technology” (2002), and aimed at realising and demonstrating the results of these studies.
READ MORE
Broken image

ICSAD Alpbach 2007

International Competition on Sustainable Architecture and Design 2007 GrAT organized ICSAD 2007 to give architecture students an insight on sustainable building solutions and to encourage them to integrate this new perspective in their design activities. With the funding of Austrian...
READ MORE

ICSAD Shanghai

International Competition on Sustainable Architecture and Design at the EXPO Shanghai  The competition ICSAD invites students from around the world to send in their designs for sustainable buildings. The selected students of the ICSAD 2010 convened at the EXPO Shanghai...
READ MORE
1 5 6 7 8